Students will continue to work on their "Syringe Cranes" with their design teams(Due May 2). In addition students will continue to work on their "Resumes"(Due May 2), begin their "Cover Letters and "Future Job Applications.
0 Comments
Students will continue to build their Resumes(DUE May 1st) and begin Cover Letters(DUE May 8th) . In addition, students will continue to work with their deisgn team to construct a " Syringe Crane"(DUE May 1st).
Students will continue to use the Engineering Design Process to design and construct a "Syringe Crane"(Hyrdualics or Pnuematics). In addition, students will work on their Resumes and Cover Letters.
Students will be introduced to "Fluid Power" (Hydrualics and Pnuematics Systems). Students will use the basi foundation on "Fluid Power" and the Engineering Design Process to design and construct their "Syringe Crane" .
|
CategoriesArchives
December 2018
|